Ferrovane

Oil & Gas Plants

HomeService Overview
Oil and gas processing plant at dusk

Turnkey Oil & Gas Plant Fabrication

We build and install the modular process skids and pipeline work that keep a plant on line, delivered by crews who plan the shutdown to the hour and hand the unit back ahead of the window. Nothing leaves our floor without a stamped drawing behind it and a test certificate stapled to it.

From the anchor bolts to the first live cycle, one accountable team owns the survey, the fabrication, the install and the sign-off, so you are never chasing three subcontractors across a single deadline.

Why Work With Us Here

Because the people who sign the drawings are the same people who stand on the floor at startup. That is rarer in heavy industry than it should be, and it is the whole reason our clients rehire us.

Advanced Fabrication

Robotic welding cells and CNC lines that hold the thousandth of an inch on every part we ship.

On-Schedule Handover

One schedule, weekly photo updates, and a unit handed back inside the window we promised.

Ticketed Engineers

Stamped in-house drawings and vetted trades who treat a clean, safe floor as the baseline.

Proof On Paper

Every skid pressure-tested under load and shipped with the certificate that proves the rating.

Refinery pipework under commissioning

Method And Sequence

We choose the metal before we cut it and plan the outage before we quote it. The result is a build that fits the first time and a shutdown that ends when we said it would.

Engineering and buildersMetal factory fabricationRobotics and oil integrationResearch beyond the planFixed pricing and ratesTurnaround consulting

What You Walk Away With

You get senior people on your site, one number up front with no surprise change orders, and a commissioning report that matches the drawings to the decimal. When something runs warm two months later, we are back on site the same day.

Questions We Hear Often

Send us the load data and the deadline. We walk the floor, tell you plainly what the site and the budget will allow, and put a fixed number in writing before a single part is quoted.

Yes. Most of our retrofits happen without costing you a shift. We plan the shutdown to the hour and hand the unit back inside the window we promised.

Every drawing is stamped by in-house engineers, and our millwrights, electricians and process technicians are ticketed and train year round.

We sign the unit off under load, hand over the manuals and warranties, and stay reachable. When a bearing runs warm months later, we are on site the same day.