A restored entry hall and staircase
Contact

Book a walkthrough at your kitchen table

Send the room, the rough timeline, and a budget range. We will tell you honestly whether we are the right builder for it.

Contact

Talk to a builder

Tell us about the room, the timeline, and the budget you have in mind. A lead carpenter answers, not a salesperson, and you hear back the next business day.

Shop
1420 Fulton Street West, Suite 3, Grand Rapids, MI
Shop hours
Monday to Friday, 7am to 4pm

Demo form. Nothing is submitted or stored anywhere.

Thanks. This is a demo form, so nothing was sent. On a live site this would reach the shop inbox and a lead carpenter would reply within one business day.
FAQs

Answers before you call

Still stuck on something? Send it over and a carpenter will answer it.

Ask a question

Grand Rapids, East Grand Rapids, Ada, Rockford, Grandville, and Holland, roughly a forty minute drive from the shop on Fulton Street.

A bathroom usually runs three to five weeks, a kitchen six to nine, and an addition four to seven months from permit to punch list. You get a written schedule before demolition and a revised one in any week that changes.

The first visit and the ballpark range cost nothing. A full fixed price bid with drawings and named allowances is a paid design step, and that fee is credited back into the job if you build with us.

Most kitchens and baths need a permit but not an architect. Additions, load bearing changes, and anything structural need stamped drawings, and we manage the survey, engineering, and inspections on your behalf.

Two years on our labor plus the balance of the manufacturer warranty on everything we install. We also come back near the eleven month mark to adjust the doors and drywall seams that settle in the first year.

Usually yes. We build a dust wall, run air scrubbers, keep one bathroom live, and agree on working hours with you. Kitchen clients get a temporary sink and counter set up elsewhere in the house.

Send the form on this page or call the shop. We visit, measure, and talk budget honestly on that first trip, then send a range within a week so you can decide whether a paid bid makes sense.

22

Years on the tools

Framing, finish carpentry, and whole-room remodels since 2004

310

Homes remodeled

Kitchens, baths, additions, and finished lower levels

18

Trades on staff

Carpenters, tile setters, and finish crews on payroll

100%

Fixed price bids

Every scope priced in writing before demolition day

Figures on this page are illustrative examples for a template demo, not a record of real projects.